The church building underwent a major refurbishment in 2015.
Here are a few before and after photos of the internal work. (click to enlarge).
Below are some photos of the work as it progressed (most recent photos appear first)
View from Entrance
View from Pulpit (middle)
View from Pulpit (left)
View of Pulpit
View from Upper Gallery
Tiling the disabled WC
Tiling the disabled WC
view from the pulpit
view from main entrance door
Disabled WC
inside standard WC. The boiler will be boxed in.
plumbing services in place in the new disabled WC
Insulation under the floorboards
plumbing services in place in the Standard WC
Last few floorboards being screwed down
Last few floorboards being screwed down
New partition wall starting to take shape
Frames for the three sets of double doors in place
8 May
the two cast iron pillars in place supporting the balcony. These are aligned with the where the middle pair of glazed doors will go, forming a centre aisle when we choose to use that seating configuration.
two cast iron pillars, reclaimed from an old chapel. These will be installed to support the rear balcony
under-floor insulation ready to install
Pews all gone and new chairs stacked away and protected from dust
repairing the surface water drain which was blocked, and replacing the ssteel water main which leaked